Well Placement

Maximizing reservoir access while minimizing capex and opex drives all our well placement workflows.

Multiple well placement scenarios are examined for CAPex (Cost to drill & abandon), OPEX (Cost to Produce) and reserves (revenue from producing life) to arrive at optimum well placement solution for your appraisal project or field development. The following maps are provided to support the design conclusions for well and pad placement.

  • Base Structure Map
  • Net Pay Map
  • By-pass Pay Map
  • Subsurface drainage area polygons
  • Surface terrain map
  • Shape Files for all surface pads

Additional maps can be provided upon request.

Well Placement Examples

Well Placement Example 1

Well Placement Example 2

Are you an oil and gas operator or directional drilling contractor in need of directional well plans and well planning support? We can help you get on the right path. Let's get Started.

BTW, your first well plan is free!!!