Maximizing reservoir access while minimizing capex and opex drives all our well placement workflows.
Multiple well placement scenarios are examined for CAPex (Cost to drill & abandon), OPEX (Cost to Produce) and reserves (revenue from producing life) to arrive at optimum well placement solution for your appraisal project or field development. The following maps are provided to support the design conclusions for well and pad placement.
- Base Structure Map
- Net Pay Map
- By-pass Pay Map
- Subsurface drainage area polygons
- Surface terrain map
- Shape Files for all surface pads
Additional maps can be provided upon request.